All the construction and infrastructure works of the powerhouse’s offices, lodgings, basketball building, tavern and cafeteria were done by us.
All the works for the re-functioning of the offices of the power plant, consisting of a closed area of 2250 m2, the new building additions, the newly joined offices, the conference hall and the training building named TFB Spektrum were completely done by us. All construction and infrastructure work in these areas have been completed. Architectural design, implementation, control works and consultancy were carried out during the construction. All furniture supplies were made, special production furniture designs were prepared and manufactured. All decoration works of the areas were also done by ABBA Architecture.
Belonging to the power plant; 3+1, 2+1 and 1+1 lodgings were designed, furniture was supplied, custom furniture designs were prepared and manufactured. All decoration works of the areas were also done by ABBA.
The basketball building of the power plant, consisting of a closed area of 300 m2, was renewed, colored and graffiti works were done. In this process, consultancy service was provided by ABBA Architecture.
Designed for residents living in the area of the power plant; all construction and infrastructure works of the social facility, which consists of 750 m2 closed area and 150 m2 open area, and a total area of 900 m2, have been completed. Architectural design, implementation, control works and consultancy were carried out during the construction of the cafeteria, game hall, resting and cafe areas. All furniture supplies of the local were made, custom furniture designs were prepared and manufactured. All decoration works of Terrace Valley Social Facility Building were also done by ABBA.
The project design, furniture and decoration supplies of the powerhouse dining hall, which consists of 1300 m2 closed and 300 m2 open area, and a total of 1600 m2, were made by ABBA Architecture.
Turnkey Project
Tufanbeyli, Adana, Türkiye