In the social facility of Enerjisa Üretim Arkun Hydroelectric Power Plant, all construction and infrastructure works have been completed in the Lotus Hall of 200 m2, including 150 m2 closed area and 50 m2 open area.
Architectural design, implementation, control works and consultancy were carried out during the construction. All furniture supplies of the office were met, custom furniture were designed and manufactured. All decoration works of the office were also done by ABBA.
Turnkey Project
Yusufeli, Artvin, Türkiye
2020