In the third office of Apsiyon, all construction and infrastructure works have been completed on a total area of 450 m2, 350 m2 of which is closed and 100 m2 of which is open.
Architectural design, implementation, control works and consultancy were carried out during the construction. All furniture supplies of the office were met, custom furniture were designed and manufactured. All decoration works of the office were also done by ABBA.
Turnkey Project
Gold Plaza - Maltepe, İstanbul, Türkiye
2020