Bandırma – BALIKESİR

All the construction and infrastructure works of the power plant company’s offices, halls, control floor, main entrance as well as the local graffiti and drawing applications of the power plant were carried out by us.

>Turnkey Projects

OFFICES:

Reorganization of the existing 2-storey office building, consisting of 900 m2 area, 100 m2 additional building design, acoustics, lighting and furniture procurement.

All works for the reorganization of the 900 m2 existing building and 2-storey office building of the power plant company, the design of an additional structure of 100 m2, acoustics, lighting and furniture procurement were carried out by our company. Custom production furniture designs were prepared and manufactured. All decoration works of the office were also performed by our company.

CONTROL FLOOR:

The rearrangement, facade work and furniture procurement of the main control room, which consists of an area of 200 m2, were carried out by our company.

MAIN ENTRANCE:

All construction and infrastructure works of the power plant main entrance security unit, which consists of an area of 100 m2, were carried out by our company. 

TURNA HALL:

In the social facility of EnerjiSA ÜRETİM Bandırma Power Plant, all construction and infrastructure works have been completed in the Turna Hall that has a space of 200 m2 in total, consisting of a 150 m2 closed area and a 50 m2 open area. Control works and consultancy services were provided during construction, architectural project design, and application phases. All the furniture needs of the office were supplied, custom production furniture designs were prepared and manufactured. All decoration works of the office were also done by our company.