Yusufeli – ARTVİN

>Turnkey Projects

LOTUS HALL:

In the social facility of EnerjiSA ÜRETİM Arkun Hydroelectric Power Plant, all construction and infrastructure works have been completed in the Lotus Hall that has a space of 200 m2 in total, consisting of a 150 m2 closed area and a 50 m2 open area. Control works and consultancy services were provided during construction, architectural project design, and application phases. All the furniture needs of the office were supplied, custom production furniture designs were prepared and manufactured. All decoration works of the office were also done by our company.